Jul. 29, 2024
Split Set Mining Systems mission was to develop a system to install pre-grouted Friction Bolts using the existing equipment and methodology of regular Friction Bolts. Without compromising ease of installation, compatibility with mesh and shotcrete, overall productivity and increasing the level of safety provided.
TRM contains other products and information you need, so please check it out.
How it works; The thick grout is pre-placed into the bolt via the use of a wet cement sausage, inserted into the bolt before the installation of the bole in the hole. The bolt is then installed as normal.
Performance can be greatly improved by grouting the inside of the bolt using a thick strong grout. This occurs because Split Sets conform to the shape of the borehole in which they are installed and the grout once set locks the shape dimensions of the Split Set in the Hole. A typical 45mm borehole varies 1mm along its length.
In order to remove the grouted bolt from the hole either the grout, the steel, the rock or some combination of theses three needs to fail.
Want more information on Mesh Bolt? Feel free to contact us.
Split Set Mining Systems, manufacture, distribute and support the original IR Split Set Friction Rock Stabilisers and a complete range of ground support products, including Resin Bolts, Bearing Plates, Cable Bolts, Mine Mesh and Core Storage Systems.
Since the introduction of the IR Split Set Stabiliser in , many millions have been used in over 50 countries on seven continents around the world.
Split Set Mining Systems offers ongoing technical support in the way of operator awareness training for the correct installation procedure for ground support products supplied by Split Set Mining Systems.
With branch offices throughout Australia, Split Set Mining is always conveniently placed to service its customers.