How do you perform a molybdenum test?

Author: Evelyn

Aug. 19, 2024

Procedure for using of Molybdenum Kit

  • The engineering department shall be responsible to perform the test to determine the MOC of the contact part and non-contact part of the equipment.

    Link to YOUBO

  • PROCEDURE FOR MOLYBDENUM TEST - PharmaGuideHub

    •  Product contact parts of equipment made of SS used in production areas shall be subjected to molybdenum kit testing.
    • Test shall be conducted to verify that product contact part made of SS which are claimed to be SS316 are conforming to molybdenum test.

    • Test is based on the principle that SS 316 and SS316 L grades of stainless steel contain increased amounts of molybdenum, a dark red colour solution results upon reaction of the surface contact of the test solution indicating increased amounts of molybdenum which is a specific character of SS316/ SS316L.
    • SS 304 grade materials as it contains lesser / negligent amounts of molybdenum do not provide a colour change for the test.
    •     TEST PROCEDURE:
    • Clean the surface of contact part under test with a clean cloth.

    • Place of drop of the electrolyte solution on the clean surface of the component under test.

      Are you interested in learning more about Molybdenum Tube? Contact us today to secure an expert consultation!

    • Contact the positive (+) tip of the electrode (battery) to the component surface.

    • Dip and rub the (-) tip of the electrode (battery) to the drop of solution placed over SS component which is under test.

    • The drop of test solution shall turn to persistent red color indicative of test material as SS316 or SS316L.Drop of test solution if does not turn to red color, this shall indicate material as SS304.Wipe off the drop of solution from test surface after completing the test with a cloth.

    • Tightly close the molybdenum test solution vial with its lid.

      For more Molybdenum Pipeinformation, please contact us. We will provide professional answers.

    • Clean the tips of the electrode and secure the solution vial and electrode in a clean dry place.
    • REFERENCES:
    •    Not Applicable
    •   ANNEXURES: 
    •    Not Applicable
    •     ENCLOSURES:
    •      SOP Training Record.
    • DISTRIBUTION:
    • Controlled Copy No. 01  :          Head Quality Assurance
    • Controlled Copy No. 02  :           Head Engineering
    • Master Copy                    :          Quality Assurance Department
    • ABBREVIATIONS:

    51

    0

    Comments

    Please Join Us to post.

    0/2000

    All Comments ( 0 )

    Guest Posts

    If you are interested in sending in a Guest Blogger Submission,welcome to write for us!

    Your Name: (required)

    Your Email: (required)

    Subject:

    Your Message: (required)